6D3 – 20 CHARGING SYSTEM
In this case, the slip ring can be used until its outer
diameter becomes 0.4mm shorter than the initial size.
5) Rectifier
Conduct a rectifier continuity test using the K
Ω
range
of a circuit tester.
Specifically, change polarity between the rectifier and
holder fin, making sure that there continuity in either
one direction only. (There should not be continuity in
the other direction.)
NOTE:
It is impossible to judge a rectifier by the resistance in
the direction of easy flow. Because of diode’s
characteristics, the current in the direction of easy
flow changes greatly depending on the power source
voltage.
Therefore, a tester’s indication varies depending on
its type and resistance range variation.
Accordingly, it must be regarded as a criterion that
there is a wide difference between the resistances
easy flow and the other direction.
Never use a 500V megohmmeter for such a continuity
test, since the rectifier may be damaged.
6) Brush
Measure the protruding length from the brush holder.
mm (in)
Standard
Limit
12.5 (0.492)
5.5 (0.217)
6D3-20-1.tif
6D3-20-2.tif
6D3-20-3.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...