
GENERAL ENGINE MECHANICAL 6A – 55
6. Piston and Connecting Rod
•
Apply engine oil to the cylinder bores, the connecting
rod bearings and the crankshaft pins.
•
Check to see that the piston ring end gaps are
correctly positioned.
•
Insert the piston/connecting rod assemblies into each
cylinder with the piston ring compressor.
•
The front marks must be facing the front of the engine.
5. Connecting Rod Bearing Cap
•
Tighten the cap nuts in 2 steps, using angular
tightening method as shown in the following
specifications.
4JG2
N
∙
m (kg
∙
m/lb
∙
ft)
1st Steps
2nd Step
29 (3.0/22)
45° - 75°
4JA1, 4JB1, 4JB1TC
N
∙
m (kg
∙
m/lb
∙
ft)
83 (8.5/61)
After tightening the cap nuts, check to see that the
crankshaft rotates smoothly.
4. Piston Cooling Oil Pipe
•
Install the piston cooling oil pipe to the cylinder body.
•
Tighten the oil pipe bolts and relief valve to the
specified torque.
Oil Pipe Bolt Torque
N
∙
m (kg
∙
m/lb
∙
ft)
(1) M8 x 1.25
19 (1.9/14)
N
∙
m (kg
∙
m/lb
∙
in)
(2) M6 x 1.00
8 (0.8/69)
Oil Pressure Regulating
Valve Torque
N
∙
m (kg
∙
m/lb
∙
ft)
(3) M16 x 1.5
29 (3.0/22)
NOTE:
Check that there is no interference between the piston
and the oiling jet pipe by slowly rotating the
crankshaft.
3. Oil Pump Assembly
2. Oil Pan Assembly
Above works refer to “OIL PUMP” Section in this manual.
1. Cylinder Head Assembly
•
Piston Head Projection Measurement Point
•
Cylinder Head ASM
•
Push Rod
•
Rocker Arm Shaft ASM
Valve clearance adjustment.
Above works refer to “CYLINDER BLOCK” Section in this
manual.
6A-55-1.tif
6A-55-2.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...