GENERAL ENGINE MECHANICAL 6A – 53
5) Tighten the cap nuts in 2 steps, using angular
tightening method as shown in the following
specifications. (4JG2)
4JG2
N
∙
m (kg
∙
m/lb
∙
ft)
1st Steps
2nd Step
29 (3.0/22)
45° - 75°
4JA1, 4JB1, 4JB1TC
N
∙
m (kg
∙
m/lb
∙
ft)
83 (8.5/61)
NOTE:
Do not allow the crankshaft to rotate.
6) Remove the rod caps.
7) Measure the width of the plastigage and determine
the oil clearance. If the oil clearance exceeds the
limit, replace the rod bearings as a set.
8) Clean the plastigage from the bearings and the
crankshaft pins.
Crankshaft Journal and Bearing Clearance
mm (in)
Standard
Limit
4JB1 /
4JB1T /
4JB1TC
0.029 - 0.066
(0.0011 - 0.0026)
4JG2
0.029 - 0.083
(0.0011 - 0.0033)
0.100 (0.0039)
REASSEMBLY
11. Connecting Rod
10. Piston
9. Piston Pin
Apply a cost of engine oil to the piston pin and the piston
pin hole.
8. Piston Pin Snap Ring
Apply a thin coat of engine oil to the piston pin.
Try to insert the piston pin into the piston pin hole with
normal finger pressure.
Weigh each piston and connecting rod assembly.
Select piston and connecting rod combinations so that the
weight variation of the different assemblies a held within
the specified limits.
g (oz)
Variance in weight
after assembly
Less than 3
(0.1058)
NOTE:
When changing piston/connecting rod combinations,
do not change the piston/piston pin combination
6A-53-1.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...