ENGINE FUEL 6C - 41
INJECTION TIMING ADJUSTMENT
•
Set No. 1 cylinder to top dead center.
•
Remove injection pump distributor head plug.
•
Cancel wax CSD with the handle of a screw driver.
•
Fit a dial gauge and set lift to 2 mm.
Measuring device: 5-8840-0145-0
•
Set crankshaft damper pulley top dead center mark
about 45° before top dead center from the pointer.
•
Set dial gauge in the "0" position.
•
Turn the crankshaft a little right wise and left wise and
see if the pointer is stable in the "0" position.
•
Turn the crankshaft in the normal direction and read
the measuring device's indication at as follows.
4JB1
BTDC 14°, BTDC 12° (’91/
542A)
4JB1T
BTDC11°
4JB1TC
BTDC4°
4JG2 (Belt Drive Type) ATDC 1° (’91/ 542A)
TDC 0° (’91/ 542B)
" (Gear Drive Type) ATDC 2° (’91/ 542A)
Measuring Device's Indication
mm (in)
Standard
0.5 (0.0197)
•
If it reads abnormal, loosen injection pump fixing nut
and pump bracket adjust bolt, make adjustment by
changing the pump mounting angle, and tighten the
nut and bolt to the specified torque where the dial
indicates the specified valve.
Pump fixing nut
N
∙
m (Kg
∙
m/lb
∙
ft)
24 (2.4/17)
Adjust bolt
N
∙
m (Kg
∙
m/lb
∙
ft)
19 (1.9/14)
•
Remove the measuring device and tighten the
distributor head plug to the specified torque.
N
∙
m (Kg
∙
m/lb
∙
ft)
17 (1.7/12)
CAUTION
•
When installing the distributor head plug, be sure to
use new copper washer.
•
Connect injection pipe.
•
Fit pipe clip where specified.
6C-40-3.tif
6C-40-4.tif
6C-40-1.tif
6C-40-2.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...