6A1 – 24 4JB1/4JB1T/4JB1TC/4JG2 - ENGINE
7. Noise Cover Spacer
8. Timing Gear Case Cover
9. Oil Pipe
10. Idler Gear
1) Measure the camshaft timing gear backlash and the
crankshaft timing gear backlash before removing the
idler gear.
2) Measure the idler gear end play before removing the
idler gear.
NOTE:
Refer to the following items for details on the
backlash and end play measurement procedures.
Timing Gear Backlash Measurement
1) Set a dial indicator to the timing gear to measured.
Hold both the gear to be checked and the adjoining
gear stationary.
2) Move the gear to be checked as far as possible to
both the right and the left.
Take the dial indicator reading.
If the measured value exceeds the specified limit, the
timing gear must be replaced.
Timing Gear Backlash
mm (in)
Standard
Limit
0.10-0.17 (0.0039-0.0067)
0.30 (0.012)
Idler Gear "A" End Play Measurement
Insert a feeler gauge between the idler gear and the thrust
collar to measure the gap and determine the idler gear
end play.
If the measured value exceeds the specified limit, the
thrust collar must be replaced.
Idle Gear End Play
mm (in)
Standard
Limit
0.07 (0.0028)
0.2 (0.0079)
6A1-24-1.tif
6A1-24-2.tif
6A1-24-3.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...