ENGINE ELECTRICAL 6D1 – 3
4. LOAD TEST
(1) Connect a voltmeter and a battery load tester across
the battery terminals.
(2) Apply 300 ampere load for 15 seconds to remove
surface charge from the battery.
Remove load.
(3) Wait 15 seconds to let battery recover. Then apply
specified load from specifications (See Main Data and
Specifications in this section).
Read voltage after 15 seconds, then remove load.
a. VOLTAGE DOES NOT DROP BELOW THE
MINIMUM LISTED IN FOLLOWING TABLE - The
battery is good and should be returned to service.
b. VOLTAGE IS LESS THAN MINIMUM LISTED -
Replace battery.
ESTIMATED TEMPERATURE
°F
°C
MINIMUM VOLTAGE
70
21
9.6
60
16
9.5
50
10
9.4
40
4
9.3
30
-1
9.1
20
-7
8.9
10
-12
8.7
0
-18
8.5
The battery temperature must be estimated by feel and by the
temperature the battery has been exposed to for the
preceding few hours.
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...