Selenio
TM
BNP User Guide, Release 3.7.1
176
- Working with PIDs
5.
Click
OK
.
The new ES will appear under the program. The mapping window shows the same PID in both
programs, with the (dummy) PID in Program 1 grayed out.
Figure 123. Dummy data PID in Program grayed out
Clicking on the program of the grayed out data PID and selecting
Manage Elementary Streams
will show the Dummy PID status of
Yes
and a Reserved PID status of
Yes
as well:
Figure 124. Manage ES - Dummy and Reserved status