Adding
Processor
Capacity
To
enable
additional
processors
in
the
configuration
of
a
system
that
has
the
Capacity
Upgrade
on
Demand
feature
installed
and
running,
do
the
following.
1.
To
increase
the
number
of
authorized
processors,
type
the
following
at
the
command
line:
chcod
-r
proc
-n
total_number_of_processors
The
following
is
an
example
of
the
above
command:
chcod
-r
proc
-n
6
In
the
example
above,
the
value
of
-n
6
is
equal
to
the
total
number
of
processors
that
you
want
to
have
authorized
(yy)
by
entering
this
command.
To
upgrade
your
system
to
use
more
of
the
installed
processors,
increase
the
value
of
(yy)
in
increments
of
2.
In
this
case,
6
would
represent
4
base
processors
plus
2
additional
Capacity
Upgrade
on
Demand
processors.
When
the
system
performs
the
command
to
enable
additional
processors,
information
about
the
new
system
configuration
is
added
to
the
error
log
and
sent
through
the
Electronic
Service
Agent
to
the
service
support
center.
2.
Shut
down
and
reboot
the
system
to
enable
the
additional
processors,
as
follows:
shutdown
-Fr
3.
Log
in
to
the
system
as
root
user
or
as
a
user
with
system
group
privileges.
4.
Type
the
following
at
the
command
line:
chcod
The
following
information
displays:
Current
MailAddress
_______Reserved________
Current
CustInfo
Jane_Doe-CustomerNumber_9999999-Phone_(333)_444-5555
Current
Model
and
System
ID
=
IBM,
xxxx-xxx_IBM,xxxxxxx
Current
number
of
authorized
proc(s)
out
of
(xx_____)
installed
on
system
=
(yy_____)
The
values
of
(yy)
should
match
the
value
you
entered
for
the
total_number_of_processors
in
step
1.
For
details
about
the
flag
variables
entered
in
the
chcod
command,
see
Appendix
D,
“Using
the
chcod
Command,”
on
page
503.
Chapter
7.
Using
the
Capacity
Upgrade
on
Demand
Feature
357
Содержание RS/6000 Enterprise Server M80
Страница 1: ...RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...
Страница 10: ...x Service Guide...
Страница 14: ...xiv Service Guide...
Страница 16: ...xvi Service Guide...
Страница 22: ...Data Flow 4 Service Guide...
Страница 28: ...CEC Drawer Front View With Bezel Removed 3 2 1 1 Power On Off LED 2 Fan 2 3 Fan 1 10 Service Guide...
Страница 30: ...CEC Card Cage Rear of CEC drawer viewed from top cover removed 12 Service Guide...
Страница 84: ...66 Service Guide...
Страница 176: ...158 Service Guide...
Страница 376: ...358 Service Guide...
Страница 430: ...412 Service Guide...
Страница 445: ...3 Insert the memory module firmly into the connector Chapter 10 Removal and Replacement Procedures 427...
Страница 476: ...7 Remove the screws that connect the carrier to the CD ROM Replacement Replace in reverse order 458 Service Guide...
Страница 485: ...Chapter 11 Parts Information This chapter contains parts information for the system 467...
Страница 486: ...CEC Drawer Card Assembly 9 468 Service Guide...
Страница 488: ...CEC Drawer Backplane 5 2a 1 2 3 4 470 Service Guide...
Страница 490: ...CEC Drawer Power Supplies 1 2 3 4 5 6 7 8 9 472 Service Guide...
Страница 492: ...CEC Drawer Fan Assemblies 2 1 3 4 5 6 8 9 10 11 12 13 7 14 474 Service Guide...
Страница 494: ...I O Drawer 1 2 3 4 5 6 7 8 9 10 11 16 17 18 19 20 12 14 13 13 15 21 22 23 24 26 25 27 476 Service Guide...
Страница 496: ...7 8 9 10 6 1 2 3 4 4 5 478 Service Guide...
Страница 508: ...490 Service Guide...
Страница 520: ...502 Service Guide...
Страница 522: ...504 Service Guide...
Страница 526: ...508 Service Guide...
Страница 542: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done 524 Service Guide...
Страница 558: ...540 Service Guide...
Страница 565: ......
Страница 566: ...Printed in USA September 2001 SA38 0571 01...
Страница 567: ...Spine information RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...