Appendix
C.
Service
Processor
Setup
and
Test
For
your
convenience,
an
example
of
a
basic
service
processor
setup
checklist
is
included
here.
Your
setup
may
include
more
or
fewer
of
the
available
features,
so
you
can
adjust
this
checklist
for
your
own
application
so
that
it
is
helpful
to
you.
Service
Processor
Setup
Checklist
1.
Unplug
the
power
cord
from
the
server.
2.
Attach
a
local
terminal
for
this
setup
procedure.
3.
Plug
in
the
system
and
power
on
the
local
terminal.
Attention:
Make
sure
that
system
power
remains
off.
4.
Start
the
service
processor
menus.
See
Chapter
8,
“Using
the
Service
Processor,”
on
page
359.
5.
Set
the
system
name.
See
“Privileged
User
Menus”
on
page
361.
6.
Enable
surveillance.
See
“Service
Processor
Functions”
on
page
386.
7.
Configure
Call-In/Call-Out.
See
“Call-In/Call-Out
Setup
Menu”
on
page
380.
8.
Exit
the
service
processor
menus.
9.
Unplug
the
power
cord
from
the
system.
10.
Attach
modems
(if
needed).
See
“Accessing
the
Service
Processor
Menus
Remotely”
on
page
360.
11.
Plug
in
the
system.
Attention:
Make
sure
that
the
system
power
remains
off.
12.
Test
both
of
the
following:
v
Call-In,
see
“Testing
Call-In”
on
page
500
v
Call-Out,
see
“Testing
Call-Out”
on
page
500
13.
Use
the
“Save
or
Restore
Hardware
Management
Policies,”
in
the
“Introduction
to
Tasks
and
Service
Aids”
section
of
the
RS/6000
and
Eserver
pSeries
Diagnostic
Information
for
Multiple
Bus
Systems
to
back
up
the
service
processor
settings.
Note:
This
step
is
strongly
recommended
to
protect
the
usefulness
of
the
service
processor
and
the
availability
of
the
server.
Your
service
processor
is
now
ready
for
use.
499
Содержание RS/6000 Enterprise Server M80
Страница 1: ...RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...
Страница 10: ...x Service Guide...
Страница 14: ...xiv Service Guide...
Страница 16: ...xvi Service Guide...
Страница 22: ...Data Flow 4 Service Guide...
Страница 28: ...CEC Drawer Front View With Bezel Removed 3 2 1 1 Power On Off LED 2 Fan 2 3 Fan 1 10 Service Guide...
Страница 30: ...CEC Card Cage Rear of CEC drawer viewed from top cover removed 12 Service Guide...
Страница 84: ...66 Service Guide...
Страница 176: ...158 Service Guide...
Страница 376: ...358 Service Guide...
Страница 430: ...412 Service Guide...
Страница 445: ...3 Insert the memory module firmly into the connector Chapter 10 Removal and Replacement Procedures 427...
Страница 476: ...7 Remove the screws that connect the carrier to the CD ROM Replacement Replace in reverse order 458 Service Guide...
Страница 485: ...Chapter 11 Parts Information This chapter contains parts information for the system 467...
Страница 486: ...CEC Drawer Card Assembly 9 468 Service Guide...
Страница 488: ...CEC Drawer Backplane 5 2a 1 2 3 4 470 Service Guide...
Страница 490: ...CEC Drawer Power Supplies 1 2 3 4 5 6 7 8 9 472 Service Guide...
Страница 492: ...CEC Drawer Fan Assemblies 2 1 3 4 5 6 8 9 10 11 12 13 7 14 474 Service Guide...
Страница 494: ...I O Drawer 1 2 3 4 5 6 7 8 9 10 11 16 17 18 19 20 12 14 13 13 15 21 22 23 24 26 25 27 476 Service Guide...
Страница 496: ...7 8 9 10 6 1 2 3 4 4 5 478 Service Guide...
Страница 508: ...490 Service Guide...
Страница 520: ...502 Service Guide...
Страница 522: ...504 Service Guide...
Страница 526: ...508 Service Guide...
Страница 542: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done 524 Service Guide...
Страница 558: ...540 Service Guide...
Страница 565: ......
Страница 566: ...Printed in USA September 2001 SA38 0571 01...
Страница 567: ...Spine information RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...