Process
Flow
for
Capacity
Upgrade
on
Demand
The
following
flowchart
provides
an
overview
of
the
process
that
is
required
to
enable
Capacity
Upgrade
on
Demand
on
systems
that
need
reserve
capacity.
System is ordered with Capacity
Upgrade on Demand feature
Capacity Upgrade on Demand
feature is ordered for upgrade to
customer system
Capacity Upgrade On Demand
feature is installed and available
when needed. Use
.
chcod command
to enable additional processors
chcod
Or
Customer installation site is made
ready for system with Capacity
Upgrade on Demand feature:
Dedicated phone line installed
Electronic Service Agent available
Name and address available
System or feature hardware
is installed
Diagnostics used to verify installation
Customer information is completed
using
command
chcod
System begins monitoring logs for
changes to capacity upgrade
on demand features. Reports to
support center for processor upgrade
activity.
AIX and Capacity Upgrade on
Demand enabling code is installed
Electronic Service Agent installed on
system with dedicated phone line
connected to modem
Customer system is made
ready for Capacity Upgrade on
Demand feature:
Dedicated phone line installed
Electronic Service Agent available
Name and address available
Capacity Upgrade on Demand
enabling code is installed
Time is scheduled for installation
352
Service
Guide
Содержание RS/6000 Enterprise Server M80
Страница 1: ...RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...
Страница 10: ...x Service Guide...
Страница 14: ...xiv Service Guide...
Страница 16: ...xvi Service Guide...
Страница 22: ...Data Flow 4 Service Guide...
Страница 28: ...CEC Drawer Front View With Bezel Removed 3 2 1 1 Power On Off LED 2 Fan 2 3 Fan 1 10 Service Guide...
Страница 30: ...CEC Card Cage Rear of CEC drawer viewed from top cover removed 12 Service Guide...
Страница 84: ...66 Service Guide...
Страница 176: ...158 Service Guide...
Страница 376: ...358 Service Guide...
Страница 430: ...412 Service Guide...
Страница 445: ...3 Insert the memory module firmly into the connector Chapter 10 Removal and Replacement Procedures 427...
Страница 476: ...7 Remove the screws that connect the carrier to the CD ROM Replacement Replace in reverse order 458 Service Guide...
Страница 485: ...Chapter 11 Parts Information This chapter contains parts information for the system 467...
Страница 486: ...CEC Drawer Card Assembly 9 468 Service Guide...
Страница 488: ...CEC Drawer Backplane 5 2a 1 2 3 4 470 Service Guide...
Страница 490: ...CEC Drawer Power Supplies 1 2 3 4 5 6 7 8 9 472 Service Guide...
Страница 492: ...CEC Drawer Fan Assemblies 2 1 3 4 5 6 8 9 10 11 12 13 7 14 474 Service Guide...
Страница 494: ...I O Drawer 1 2 3 4 5 6 7 8 9 10 11 16 17 18 19 20 12 14 13 13 15 21 22 23 24 26 25 27 476 Service Guide...
Страница 496: ...7 8 9 10 6 1 2 3 4 4 5 478 Service Guide...
Страница 508: ...490 Service Guide...
Страница 520: ...502 Service Guide...
Страница 522: ...504 Service Guide...
Страница 526: ...508 Service Guide...
Страница 542: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done 524 Service Guide...
Страница 558: ...540 Service Guide...
Страница 565: ......
Страница 566: ...Printed in USA September 2001 SA38 0571 01...
Страница 567: ...Spine information RS 6000 Enterprise Server Model M80 Eserver pSeries 660 Model 6M1 Service Guide SA38 0571 01...