Procedure
Step 1 Adjust the base height.
1. Measure the distance (H) between the concrete floor and the upper surface
of the ESD floor using a ruler and record the value of H.
Figure 3-6 Measuring the ESD floor height
2. Adjust the base height to H and tighten the height locking bolts on the feet.
FusionModule2000-S Smart Modular Data Center
User Manual
3 Hardware Installation
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
29