Figure 4-17 Ports on a smart ETH gateway
(1) PWR_IN cascading power
port
(2) FE_1 cascading signal port (3) PoE_1–2 ports
(4) PoE_3–4 ports
(5) 48V_OUT1 power output
port
(6) 48V_OUT2 power output
port
(7) FE_2 cascading signal port (8) PWR_OUT cascading power
port
(9) BLINK button
(10) Status indicator
Procedure
Step 1 Take out the ground cable from the smart ETH gateway fitting bag and connect
the cable to the ground screw on the smart ETH gateway.
Step 2 Connect the PWR_OUT port on the smart ETH gateway to the 53.5VDC_OUT1 or
53.5VDC_OUT2 port on the ECC800-Pro using a power cable.
Step 3 Connect the FE_2 port on the smart ETH gateway to the LAN_2/POE port on the
ECC800-Pro using a network cable.
----End
4.4 Connecting Cabinet Electronic Clasp Lock Cables
Prerequisites
The cabinet electronic clasp locks have been installed.
NO TICE
Only the electronic clasp locks of IT cabinets and smart cooling products need to
be connected to the ECC. This section describes only how to connect electronic
clasp lock cables of the IT cabinets and smart cooling products. This does not
apply to PDFs and battery cabinets.
FusionModule2000-S Smart Modular Data Center
User Manual
4 System Cabling
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
114