Step 11 Secure other bases in the same way.
Step 12 Connect bases using connecting plates, as shown by (1) in below figure.
Figure 3-12 Connecting bases
Step 13 Screw the floor holder to the base, as shown by (2) in above figure.
----End
Follow-up Procedure
Check the installation and ensure that adjacent bases are in close contact with
each other and the gap is even.
3.3 Installing Cabinets
Prerequisites
The floor levelness meets engineering requirements.
Context
To position a cabinet, perform the following steps:
1. Determine the positions for installing the equipment cabinet and smart
cooling product cabinets based on the layout diagram.
2. Place the equipment cabinet at the correct installation position.
3. Place other smart cooling product cabinets at the specified positions in
sequence.