UPS5000-S-1200 kVA
User Manual
3 Installation
Issue 04 (2019-06-25)
Copyright © Huawei Technologies Co., Ltd.
68
Procedure
Step 1
Remove the top cover from the power unit, and remove the bracket of the battery grounding
failure detector.
Figure 3-38
Removing the cover and bracket
Step 2
Mount the battery grounding failure detector onto the bracket and reinstall the bracket in the
cabinet.
Figure 3-39
Installing a battery grounding failure detector
Step 3
Connect cables.
1.
Connect the power cables of the battery grounding failure detector to copper bars U and
N on the top of the cabinet.
2.
Connect the signal cable of the battery grounding failure detector to the dry contact card
(MUE05A) of the control module of the power unit.
3.
Connect the transformer and battery grounding failure detector.