UPS5000-S-1200 kVA
User Manual
3 Installation
Issue 04 (2019-06-25)
Copyright © Huawei Technologies Co., Ltd.
69
Figure 3-40
Connecting cables
Step 4
Reinstall the cover on the top of the power unit.
----End
3.2.5.2 Installing the Maintenance Bypass Unit
Prerequisites
No busbars have been installed for the UPS.
Procedure
Step 1
Determine the installation position for the maintenance bypass unit based on the cabinet
securing holes in the marking-off template.
A: mounting holes on the channel steel
B: mounting holes on the floor