UPS5000-S-1200 kVA
User Manual
3 Installation
Issue 04 (2019-06-25)
Copyright © Huawei Technologies Co., Ltd.
85
3.3 Parallel System Installation
3.3.1 Connecting Power Cables
Procedure
Step 1
Ground each UPS in a parallel system separately, and connect power cables and battery
cables.
Step 2
Choose a parallel mode and connect cables to the parallel system based on site requirements.
Figure 3-68
1+1 parallel system schematic diagram
Connect power cables according to port silk screen.