
SmartLogger2000
User Manual
4 Electrical Connection
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
68
Figure 4-25
Removing the terminal block
Use a flat-head screwdriver to remove the terminal block.
Step 4
Connect cables to the terminal block and secure the cables.
Figure 4-26
Connecting cables
Step 5
Insert the terminal block into the DI port.
To ensure that the power grid scheduling function is normal, set the corresponding parameters
(
Active Power Control
or
Reactive Power Control
) on the embedded WebUI after
connecting cables. For details, see
----End
Follow-up Procedure
Disconnection can be performed in reverse order.