8 Power Grid Scheduling
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
186
Figure 8-1
Active power control
Reactive Power Control
Large-scale PV plants are required to adjust the voltage at the grid-tied point. Power grid
scheduling personnel enable the PV plant to absorb or add the reactive power at the grid-tied
point, that is, to enable the reactive power compensation, based on the real-time reactive
power transmission status in the power grid.
Because of permission restriction, log in as
Special User
. Choose
Settings
>
Reactive power
control
to access the target page.