
SmartLogger2000
User Manual
8 Power Grid Scheduling
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
199
control mode
to
Remote scheduling
after receiving a scheduling command from the
upstream NMS.
Figure 8-16
Remote scheduling
8.3.9 Power Factor Closed-loop Control
Before setting this parameter, ensure that the electricity meter connects to the SmartLogger.
For details, see
Set
Reactive power control mode
to
Pwr factor closed-loop control
.