SmartLogger2000
User Manual
7 WebUI
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
170
Figure 7-68
Network diagram (with circuit breaker)
In the scenario with circuit breaker, put the power supply position of the SmartLogger before
the circuit breaker to avoid the SmartLogger power-off after the DO control circuit breaker is
switched off.
Setting Parameters
Before setting the parameters, ensure that the Modbus power meter and inverter are connected to the
WebUI. Then take the following steps to complete the settings.
1.
Log in as
Advanced User
, and choose
Monitoring
>
SUN2000
>
Running Param.
>
Feature
Parameters
. In the displayed page, set
Communication interrupt shutdown
and
Communication
resumed startup
to
Enable
, and set
Communication interruption duration
as required.
2.
Log in as
Special User
, and choose
Monitoring
>
SUN2000
>
Running Param.
>
Power
Adjustment Parameters
. In the displayed page, set
Active power change gradient
. If the
maximum parameter is 50%/s, set to the maximum. If it is 1000%/s, set to 125%/s.
3.
Log in as
Special User
, and choose
Settings
>
Active power control
to go to the page. Ensure that
Active power control
is set to
Disable
.
Because of permission restriction, log in as
Special User
. Choose
Settings
>
Export
Limitation
.