
SmartLogger2000
User Manual
8 Power Grid Scheduling
Issue 04 (2018-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
192
Figure 8-7
Synchronizing the clock source
1.
Clock source
: Set
NTP
.
2.
Server
: Set the server IP address or domain name.
3.
NTP synchronization test
: Check the time synchronization status.
Set
Active power control mode
to
Remote output control
.
Figure 8-8
Remote Output Control
Control area
: Set the area where the remote output control function is used. To enable the function
in some areas, the license needs to be imported and enabled.
Output control duration
: Set the time required for the inverter to change its output power from 0%
to 100% or from 100% to 0%.
PV plant ID
: Set the ID assigned by the power company to the SmartLogger.
Remote output control server
: Set the server IP address or domain name.
If the connection between the SmartLogger and the server is abnormal, obtain the output control file
in
.data
format from the website of the power company and import the file.
After the SmartLogger connects to the server, you can export the relevant file.