![horsch Maestro 16 SX Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/horsch/maestro-16-sx/maestro-16-sx_operating-instructions-manual_2164097053.webp)
Operation | 6
60026387 • 01 • 03/2021 • en
53
Seed
Ø
Check the quality of the seed, see chapter Metering system single grain Air-
Speed, Checking section.
Drill unit
Ø
Have the fitting metering discs been selected and installed in all metering
units?
Ø
Have all metering units been correctly adjusted?
Ø
Has the trap roller been adjusted correctly?
Ø
Have the fitting press rollers been selected and correctly adjusted?
Ø
Have the clearing stars (option) been adjusted correctly?
Ø
Is the Overpressure correctly adjusted?
Ø
Has the drilling depth been adjusted correctly?
Ø
Has the coulter pressure (fan and springs on drill units behind the tractor
tracks) been set correctly?
Ø
Has the drill unit been aligned correctly (parallel guide horizontal)?
Содержание Maestro 16 SX
Страница 2: ......
Страница 155: ...Appendix 17 60026387 01 03 2021 en 155...
Страница 156: ...156 60026387 01 03 2021 en Notes...
Страница 157: ......