116
60026387 • 01 • 03/2021 • en
13 Optional equipment
13.1 Micro-granular compound facility
With the micro-granular compound facility additional granulate, e.g. pesticides or
fertiliser, is placed.
Depending on equipment and setting, the granulate can be placed with the grains
into the seed furrow, or on the surface.
The system consists of a pressure hopper, a metering unit with metering auger and
an electric drive.
Ø
Always check the cover for leak tightness with the fan running, after it had
been opened.
Ø
If necessary, readjust the hinges or replace the gasket.
NOTE
Pressure hopper cover, hoses and connections must be leak tight. Air losses reduce
the placing quantity!
Ø
Always check the cover for leak tightness with the fan running, after it had
been opened.
Ø
If necessary, readjust the hinges or replace the gasket.
Depending on the granulate quantity, the metering unit can be fitted with different
augers.
The actual displacement depends on various factors and can therefore only be de-
termined by calibration.
NOTE
Ø
For the selection of the metering augers, refer also to the chapter
Appendix
.
Ø
Make sure that always metering augers of the same size are installed!
Changing the metering
augers
1. If the hopper is full, remove the blind cap and insert the gate valve (see access-
ory pack) into the slot.
2. Loosen the two wing nuts on the metering unit and pull out the lid with the
metering auger.
3. Pull the spring pin out of the shaft.
4. Replace the auger. Pay attention to the condition and correct fit of the O-ring
on the auger to be used.
5. Insert the spring pin.
6. Reinsert the parts into the metering unit.
7. Turn the screw further until the hexagon can be inserted into the drive from
the top.
8. Retighten the wing nuts.
9. Remove the gate valve and attach the blind cap.
Содержание Maestro 16 SX
Страница 2: ......
Страница 155: ...Appendix 17 60026387 01 03 2021 en 155...
Страница 156: ...156 60026387 01 03 2021 en Notes...
Страница 157: ......