![horsch Maestro 16 SX Скачать руководство пользователя страница 117](http://html1.mh-extra.com/html/horsch/maestro-16-sx/maestro-16-sx_operating-instructions-manual_2164097117.webp)
Optional equipment | 13
60026387 • 01 • 03/2021 • en
117
Hopper blocked, metering auger removed
Seed calibration
The calibration sequence and the input on the terminal is identical with the calibra-
tion for seed/fertiliser.
NOTE
The metering units must first run in during initial use.
Ø
During initial use repeat calibration after one hour running.
NOTE
The metering augers must run in before calibration or before filling with seed/gran-
ulate.
Ø
Allow the metering augers to run in for at least 10 min. before calibration.
10. For calibration remove the bottom covering and hook the calibration bag to
the frame, place it under the opening.
11. Select and install the metering augers.
12. Fill the hopper with granulate.
13. Run the metering auger for at least 10 min. so that it is completely filled and
calibration will not be falsified (see instructions of the drill controls –
Filling
metering cells
).
14. Run the calibration and enter the calibration weight (see the drill controls in-
structions).
15. If equipped with two metering augers, they must both be calibrated.
Содержание Maestro 16 SX
Страница 2: ......
Страница 155: ...Appendix 17 60026387 01 03 2021 en 155...
Страница 156: ...156 60026387 01 03 2021 en Notes...
Страница 157: ......