Precision Platform 4022 Scanner
Site Preparation
10/4/07
p/n:
6510020208
2-2
•
Providing external cooling fluid to the heads and cable end
electronics module, including choosing cooling configuration,
water use, and chillers
•
Protecting the scanner from process operations
•
Ensuring radiation safety
•
Scheduling installation personnel, including contacts for setup
of installation parameters
Each of these activities is described in further detail in this chapter.
2.1. Obtaining the latest scanner installation
drawings
The first step to installing the Precision Platform is to obtain the most
recent version of the Precision Platform installation drawings. These
drawings will include the most recent dimensions and specifications for
installation and should be used when preparing the site for installation.
The latest drawing set is shipped with the system. All Honeywell Field
Project Managers have direct internet access to sites where drawings are
stored. Drawings can also be obtained from the Technical Assistance
Center (TAC).
2.2. Choosing a scanner location
Before selecting the installation location for a Precision Platform, take into
consideration:
•
the safety for those working around the scanner including
operators and service personnel
•
the appropriate location on the machine to measure the desired
parameters for observation and successful control
Содержание 4022
Страница 1: ...Precision Platform 4022 Scanner System Manual 6510020208 ...
Страница 2: ......
Страница 3: ...Precision Platform 4022 Scanner October 2007 ...
Страница 22: ......
Страница 72: ......
Страница 94: ......
Страница 126: ......
Страница 162: ......
Страница 170: ......
Страница 221: ...Scanner Maintenance Heads and sensors Figure 9 10 High Pressure Air Manifold p n 6510020208 10 18 07 9 45 ...
Страница 234: ......
Страница 239: ...Glossary p n 6510020208 10 18 07 11 5 VIO Virtual Input Output ...