
Contents
iv
14.1 Troubleshooting ................................284
Q&A (Frequently Asked Questions) ....... 284
Error Displays and Remedies ................ 296
14.2 Replacing the Measurement Circuit’s
Protective Fuse ................................300
14.3 Inspection and Repair ......................301
14.4 Disposing of the Instrument ..............302
Removing the Lithium Battery ................ 302
Appendix 1 Block Diagram.......................... A 1
Appendix 2 Four-Terminal (Voltage-Drop)
Method ..................................... A 2
Appendix 3 DC and AC Measurement ........ A 3
Appendix 4 Temperature Correction (TC)
Function ................................... A 4
Appendix 5 Temperature Conversion (
Function ................................... A 6
Appendix 6 Zero Adjustment....................... A 7
Appendix 7 Unstable Measured Values .... A 12
Appendix 8 Mitigating Noise ..................... A 19
Appendix 9 Effect of Thermal EMF ........... A 23
Appendix 10Detecting the Location of a Short
on a Printed Circuit Board ...... A 25
Appendix 11Measuring Contact Resistance
............................................... A 26
Appendix 12JEC 2137 Induction Machine-
compliant Resistance Measure-
ment ....................................... A 28
Appendix 13Making Your Own Measurement
Leads, Making Connections to the
Multiplexer.............................. A 29
Appendix 14Checking Measurement Faults
............................................... A 32
Appendix 15Using the Instrument with a
Withstanding Voltage Tester .. A 33
Appendix 16Measurement Leads (Options)
............................................... A 34
Appendix 17Rack Mounting...................... A 35
Appendix 18Outline Drawing .................... A 37
Appendix 19Calibration ............................ A 38
Appendix 20Adjustment Procedure .......... A 43
Содержание RM3545
Страница 2: ......
Страница 4: ......
Страница 26: ...Operating Precautions 18...
Страница 42: ...1 5 Checking the Measurement Target 34...
Страница 54: ...2 6 Pre Operation Inspection 46...
Страница 70: ...3 5 Checking Measured Values 62...
Страница 226: ...10 6 Supplied Connector Assembly 218...
Страница 290: ...Chapter 13 Specifications 282...
Страница 312: ...14 4 Disposing of the Instrument 304...
Страница 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Страница 362: ...Index Index 4...
Страница 363: ......
Страница 364: ......