
Chapter 13 Specifications
268
(24)Panel Save, Panel Load
(25)Clock
(26)Reset Functions
(27)Self-Test
Operation
Saves and loads measurement conditions using user-specified panel num-
bers.
Number of panels
When using the measurement terminals on the front of the instrument: 30;
when using the MUX measurement terminal setting: 8
Panel names
10 characters (letters or numbers)
Saved data
Save time and date, resistance range, 100 M
Ω
high-precision mode, Low-Pow-
er resistance measurement (LP), switching measurement currents, measure-
ment speed, zero-adjustment, average, delay, temperature correction (TC),
offset voltage compensation (OVC), scaling, self-calibration setting, contact
improver, contact check, comparator, BIN setting, judgment sound, Auto Hold,
temperature conversion (
Δ
T), statistical calculations setting, multiplexer setting
(including channels)
Loading of zero-adjust-
ment values
ON/ OFF
Default setting
ON
Auto calendar, auto leap year, 24-hour clock
Accuracy
Approx. ±4 minutes/ month
Default setting
01/01/2013, 00:00
Backup battery life
Approx. 10 years (23°C reference value)
Reset
Operation
Resets settings (except panel data) to factory defaults
System reset
Operation
Reverts all settings, including panel data, to their default values.
Multiplexer channel reset (RM3545-02 only)
Operation
Returns the multiplexer channel settings to the factory defaults.
Self-test at startup
Operation
ROM/RAM check, measurement circuit protective fuse check
Z3003 self-test (RM3545-02 only)
Operation
Each pin’s round-trip wiring resistance value is measured while in the 2-termi-
nal resistance measurement state, and the number of contacts is displayed.
Judgment criterion
Short test: FAIL when the resistance measurement is 1
Ω
or more in the short-
ed state
Open test: FAIL when no measurement fault is detected in the open state
Содержание RM3545
Страница 2: ......
Страница 4: ......
Страница 26: ...Operating Precautions 18...
Страница 42: ...1 5 Checking the Measurement Target 34...
Страница 54: ...2 6 Pre Operation Inspection 46...
Страница 70: ...3 5 Checking Measured Values 62...
Страница 226: ...10 6 Supplied Connector Assembly 218...
Страница 290: ...Chapter 13 Specifications 282...
Страница 312: ...14 4 Disposing of the Instrument 304...
Страница 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Страница 362: ...Index Index 4...
Страница 363: ......
Страница 364: ......