![Hioki DM7275 Series Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/hioki/dm7275-series/dm7275-series_instruction-manual_2137275028.webp)
23
2
Preparing for Measurement
2.1 Preparation Process
Before starting, read “Operating Precautions” (p. 7) carefully.
For more information about rack mounting, see “Appx. 7 Rack Mounting” (p. Appx.14).
(1) Position the instrument as desired.
.
(2) Perform the pre-measurement inspection.
.
(3) Connect the power cord.
(4)
Connect the measurement cables to the measurement terminals.
(5)
Connect the temperature sensor to the TEMP.SENSOR connector.
(When performing temperature measurement or using the temperature compensation function)
(6) Configure and connect the external interface (as necessary).
• Using the USB interface. (p. 98)
• Using the RS-232C interface. (p. 100)
• Using the GP-IB interface. (p. 102)
• Using the LAN interface. (p. 104)
• Using a USB flash drive
• Using the EXT I/O connector (p. 125)
(7)
Turn on the instrument.
(8)
.
2 Preparing for Measurement
Power cord
To outlet
2
Preparing for Measurement
www.
.com
1.800.561.8187
Содержание DM7275 Series
Страница 207: ...13 09 www com information itm com 1 800 561 8187...