HYBRID/TROUBLE SHOOTING
3–581
1.
Using the electrical tester, measure the resistance between the
terminals of inverter start relay connector (relay block side) and HV
ECU2 connector.
NO
YES
1.
Using the electrical tester, measure the resistance between the
terminals of inverter start relay connector and the ground.
NO
YES
10
Inspecting the PCU wire harness (lower side) for continuity 5
SHTS03ZZZ0300378
Measurement
conditions
Tester
connections
Standard values
Starter key: LOCK
Inverter start relay
connector (relay
block side)
–
HV
ECU2 connector
1st terminal
–
27th terminal
1
or less
(With continuity)
Is the measured value within the range of standard value?
Go to step 11.
Replace the PCU wire harness (lower side).
11
Inspecting the PCU wire harness (lower side) for short circuit 2
Vehicle GND
SHTS03ZZZ0300379
Measurement
conditions
Tester
connections
Standard values
Starter key: LOCK
Inverter start relay
connector
1st terminal
–
GND
5th terminal
–
GND
10 k
or more
(No continuity)
Is the measured value within the range of standard value?
Go to step 12.
Replace the PCU wire harness (lower side).