Pre-installation and User Manual
Issue 2.0
Page 58 of 172
Part No: 1EA300E01
4.3 Installation
Toolkit
If installation is to be carried out by GSI Group - Laser Division personnel, all installation
tools and equipment will be provided by GSI Group - Laser Division.
If installation is to be carried out by non-GSI Group - Laser Division personnel, all installation
tools and equipment can be ordered from GSI Group - Laser Division on request.
4.4 Fibre Optic Handling
Refer to Section 1.15 - Fibre Optic Handling prior to installing the Fibre Optic cables. Ensure
that the planned route of the Fibre Optic complies with all stated precautions.
Ensure that all safety precautions are observed whilst handling the Fibre Optic cables.
4.5 Installation Procedures
The GSI Group - Laser Division Installation Engineer will undertake the following procedures
during the course of installation:
•
External Water Supply Connection (or inspection if carried out by the Customer).
•
Power Supply Connection (or inspection if carried out by the Customer).
•
PC Communication Test.
•
Filling of Internal Cooling System.
•
Laser Tuning.
•
Testing of Interlock circuits.
•
Fibre Fitting, Alignment and Transmission.
•
Fibre Routing.
•
Focus Head Set-up.
•
Machine Interface testing
4.6 Certification
The GSI Group - Laser Division Engineer will provide certificates for satisfactory System
Installation. These will require Customer signatures. Certificates will also be provided for
delegates who successfully complete Customer Training.