3.10 Pre-installation Checks
To facilitate the installation of the JK300HP/JK300P/JK125P Series Laser, efforts must be
made to ensure that all required services, working environment and relevant personnel are
available prior to installation.
Refer to the following recommended checklist that can be used to determine that all site
preparation requirements have been satisfied.
Check List
Site Preparation Requirements
Y/N
1
Area prepared for laser footprint available.
2
Foundation is capable of supporting the laser unit(s).
3
Electrical supply meets specified requirements.
4
Electrical supply fittings available, to allow laser connection.
5
External water supply meets specified requirements.
6
Specified pipework available to allow connection to external water supply.
7
Suitable gas supply with specified pipework available to allow connection.
8
Suitable extraction system to control fumes installed in work area.
Environmental Conditions Requirements
Y/N
1
Laser operating conditions within specified temperature and humidity.
2
Class 1(I) safety enclosure available for processing.
Laser Interface Requirements
Y/N
1
Fibre routing planned, from the laser to the safety enclosure.
2
Laser integration with the remote control device, complete.
3
Laser operation interlock options complete where required.
4
Fibre / focus head interlock configuration, complete where required.
6
Workstation jigs suitable for focus lens mounting.
Personnel Requirements
Y/N
1
Electrician:
To connect electrical supply.
To connect interface and interlocks.
2
Plumber:
To connect cooling water supply.