6
308607
Pre-installation Checklist
CAUTION
Accurately and thoroughly document the Control Module port connections and dispense areas. If the Software
Map does not exactly match the way the cables are connected, the system will not operate properly. Errors that
could occur include: inability to turn on a fluid at a given dispense area; the wrong fluid or dispense point is acti-
vated; or a fluid dispense point is properly activated, but the wrong meter is monitored so the dispense job will not
shut off properly.
This process is not difficult, but it is detailed and precise. Follow all steps and document them according to this
manual to ensure a successful installation.
NOTE:
D
Follow these steps before beginning to install the Horizon system.
D
Refer also to
Installation and Troubleshooting Tips
, beginning on page 61, for information that will help you
avoid installation problems and correct any problems that may occur.
n
Pre-installation Steps
Reference
1. Locate the Floor Plan, System Map (diagram of component locations), and all
other documentation used to specify the system prior to ordering it.
If this information cannot be located, recreate it from the packing slip that
came with the system.
Packing slip and
Appendix, pages
81--106
2. Verify that all the parts on the Floor Plan match the parts shipped to you.
Floor Plan, purchase
order, and packing
slip
3. Verify that all Horizon system components are marked in their proper loca-
tions on the Floor Plan.
Floor Plan
4. Assign a name and number to all the control modules in the system. Record
the control module numbers on the Floor Plan.
D
The Master Control Module (which the Administrative Keypad and printer
or computer connect to) is always assigned number 1.
D
Additional Slave Control Modules are numbered in sequence as 2, 3, etc.
D
The control modules do not have to be in numerical order along the
network cable.
Floor Plan
5. Assign a name and number to each dispense area. Record the names and
numbers on the Floor Plan.
D
The dispense area usually consists of banks of hose reels, but may also
consist of oil bars or individual hoses.
D
The names should make sense to the shop personnel who will use the
system. For example:
Fast Lube, Service Bay 3, etc
.
Floor Plan
6. Within each dispense area, verify that the Floor Plan shows the fluid that
each reel or hose should dispense.
Floor Plan
Содержание Horizon Fluid Management Systems
Страница 81: ...308607 81 Appendix...
Страница 97: ...308607 97 Blank Forms...