GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-73
8) Loosen and remove the ground screw fastened to the AC Distribution Assembly - see
.
9) Loosen and remove the two AC Assembly mounting screws that secure the AC Distribution
Assembly to the mounting bracket on the SafeLock Cart chassis - see
10) Carefully pull the AC Distribution Assembly out towards you and remove it remove from the
SafeLock Cart.
8-4-8-4
AC Distribution Assembly Installation Procedure
1) Return the replacement AC Distribution Assembly to its position on the SafeLock Cart chassis and
secure it on the mounting bracket using the two screws (previously removed - see
2) Fasten the Ground screw to the AC Distribution Assembly -
3) Reconnect the peripheral power cable to the AC Distribution Assembly -
4) Secure all cables in position with new cable ties.
5) Return the AC Assembly cover and fasten the three screws (previously removed).
6) Return the Lower Cover (Rear), as described in the
Lower Cover (Rear) Installation Procedure on
7) Return the Upper Cover (Rear), as described in the
Upper Cover (Rear) Installation Procedure on
8) Reconnect the AC power cable to the AC Distribution Assembly at the base of the cart (rear) and
turn ON power to the SafeLock Cart.
9) Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
Figure 8-84 AC Distribution Assembly and Cable Sockets
Peripheral power
cable
Ground Screw
AC Assembly mounting
screw
AC Assembly mounting
screw
Jumper
Содержание Vivid in
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii...
Страница 739: ......