GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
8-48
Section 8-3 - Internal Component Replacement Procedures
8-3-5-5
HVPS Installation Procedure
NOTE:
When performing the following installation procedure steps, it may be helpful to review the appropriate
movie clips previously referenced in the
.
1) Return the HVPS to its original position - refer to
2) Return the five screws and fasten the HVPS in position on the Bottom Assembly, as shown in
3) Reconnect each of the two Power Supply cables to the DC Power Supply (HVPS-to-BEP and
HVPS-to-RFI), as shown in
.
4) Return the bearing handle, as described in the
Bearing Handle Installation Procedure on page 8 - 4
.
5) Make sure the Vivid
i
n/ Vivid q N LCD Display cover is securely closed and place the scanner face
down. Re-install the battery as described in the
Battery Installation Procedure on page 8 - 6
6.) Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
- only if the Vivid
i
n/ Vivid q N system
is currently mounted on the SafeLock cart
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
-
Calibration Tests on page 7 - 25
-
Содержание Vivid in
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii...
Страница 739: ......