Commissioning
Deltabar S FMD77, FMD78, PMD75 with FOUNDATION Fieldbus
72
Hauser
Closed container with superimposed steam
• All Deltabar S versions are suitable for level measurement in containers with
superimposed steam.
• FMD77: the device is ready for calibration immediately after opening the shutoff valves
(may or may not be present).
• FMD78: the device is ready for calibration immediately.
• PMD75: before calibrating the device, the pressure piping must be cleaned and filled with
fluid.
See the following table.
Valves
Meaning
Installation
1
Fill container to a level above the lower tap.
P01-xMD7xxxx-11-xx-xx-xx-005
Fig. 40:
Closed container with superimposed steam
I
Deltabar S PMD75
II
Three-way valve manifold
III
Separator
1, 5
Drain valves
2, 4
Inlet valves
3
Equalizing valve
6, 7
Vent valves on Deltabar S
A, B
Shutoff valves
2
Fill measuring system with fluid.
Open A and B.
Open shutoff valves.
Fill the negative pressure piping to the level of the
condensate trap.
3
Vent device.
Open 2 and 4.
Introduce fluid.
Close 4.
Close negative side.
Open 3.
Balance positive and
negative side.
Open 6 and 7 briefly, then
close them again.
Fill device completely with
fluid and remove air.
4
Set measuring point to operation.
Close 3.
Shut off positive side from
negative side.
Open 4.
Connect negative side.
Now
– 3, 6 and 7 are closed.
– 2, 4, A and B are open.
5
Carry out calibration.
6
7
+
–
+
A
B
3
2
4
1
5
II
I
III
III