FAP54 Programming
119
LAST PERIODIC CHECK DATE:
INVALID DATA
CHECK DATE AND TIME
[ESC]
LAST PERIODIC CHECK DATE:
06/05/2021
LAST PERIODIC CHECK DATE:
20/05/2021
PROCEDURE COMPLETED
[ESC] BACK
4.1.1.2 Last periodic check date
The date of the last periodic check is the date in which the last periodic check of the system, i.e. the check of a
minimum predetermined percentage of detectors, manual call points and input modules in signalling an alarm
condition has been carried out.
This date is compared with the system date and makes the control panel generate a system maintenance request
report after six months from the last date on which this maintenance was carried out.
NOTES
:
this signalling DOES NOT make the maintenance LED turn on; this LED will be turned on only in the case of
a maintenance event related to a single smoke detector.
In order to access the display and the entry screen for this date, select
2
from the main periodic maintenance menu.
Input and handling of this date will be subject to the following:
The first input takes place automatically when the system date is programmed (in case of subsequent restart
of the control unit, the date of the last periodic check remains the one entered the first time)
The date can be, in any case, changed manually by accessing the relevant menu, without any restrictions
The date will be, in any case, updated at the end of the periodic control procedure (described below)
If the date of the last periodic check has never been entered since the first power up of the control panel, and if the
user has not re-entered the system date and time after the last power up of the control panel, the following message
is displayed:
In this case, the user must proceed with re-entering the system date and time through the "CLOCK" submenu of the
"SERVICE" menu and then perform a general reset of the control panel. This operation is required to reset the date
and time control fault that the control panel generates each time it is turned on.
Entering the system date also leads to initialization of the last periodic check date, if it has never been
initialized before.
If the last periodic check date has been previously initialized, accessing the relevant menu makes the following
information be displayed:
In this screen, the date is still editable. Therefore, the user can edit a new date and confirm the entry by pressing
OK
.
In this case, the control panel will display the following confirmation screen:
4.1.1.3 Conformity declaration date
In this submenu, you can enter the conformity declaration date obtained from an official Body approving the system
(eg. Fire Brigade), with the following characteristics:
Manual insertion by the installer of the conformity declaration date
Storage of information in non-volatile memory
Possibility of entering the conformity declaration date again only if the control panel has not run the field
initialization procedure yet (devices have not been acquired yet in the system configuration).
Basically, the date can only be entered if the input has not occurred yet (invalid date) or if the system does NOT
contain devices yet.
It should be noted that the conformity declaration date has no use for the operation of the control panel, but it is only a
piece of information about the system.
Содержание FAP54
Страница 151: ...FAP54 Programming 151 ...