![Edwards STP Series Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/edwards/stp-series/stp-series_instruction-manual_2366164081.webp)
STP-iXA2205 Series Turbomolecular Pump
Nov. 10
71
Issue 1-h
4
OPERATION
2. Connect input
Short the circuit between (19)–(37).
Method
Starting the pump
Stopping the pump
1
1) Supply 12 to 24 VDC to the circuit between
(21)–(1).
2) Supply 12 to 24 VDC to the circuit between
(3)–(1) for 0.3 seconds or more.
However, when inputting this signal
simultaneously with switching "ON" the power
unit, supply 12 to 24 VDC to the circuit between
(3)–(1) for 10 seconds or more. Connect the (1)
pin to 0 V of 12 to 24 VDC.
Shutoff the circuit between (21)–(1).
2
Supply 12 to 24 VDC to the circuit between (3)–(1).
In this case, (21) is not used.
Shutoff the circuit between (3)–(1).
Table 15 - Starting/stopping the STP pump using voltage input (X2 REMOTE) (voltage input)
0.3 sec. or more
Stop
Rotation
Stop
㩷
12 to 24VDC
0V
(21)–(1)
(3)–(1)
X2 REMOTE
connector
0V
12 to 24VDC
Pump operation
Figure 49 - Pump operation method 1 (voltage input)
Stop
Rotation
Stop
(3)–(1)
X2 REMOTE
connector
0V
12 to 24VDC
Pump operation
Figure 50 - Pump operation method 2 (voltage input)
Содержание STP Series
Страница 22: ...STP iXA2205 Series Turbomolecular Pump Nov 10 12 Issue 1 h INTRODUCTION 1 This page intentionally blank ...
Страница 74: ...STP iXA2205 Series Turbomolecular Pump Nov 10 64 Issue 1 h INSTALLATION 3 This page intentionally blank ...
Страница 95: ...STP iXA2205 Series Turbomolecular Pump Nov 10 85 Issue 1 h 4 OPERATION Figure 55 X2 REMOTE output signal pins ...
Страница 98: ...STP iXA2205 Series Turbomolecular Pump Nov 10 88 Issue 1 h 4 OPERATION This page intentionally blank ...
Страница 172: ...STP iXA2205 Series Turbomolecular Pump Nov 10 162 Issue 1 h MAINTENANCE AND INSPECTION 8 This page intentionally blank ...