Engström Carestation
5-20
08/07 1505-1018-000
5.2.10 Verify
operation of
inspiratory effort
valve
1. Ensure both manual shut-off valves are closed.
2. On the VCB screen:
• Energize (
!
) the
Aux
iliary
Press
ure
Purge
valve.
• Energize (close) the inspiratory effort valve
(
!
Effort Valve Energized
).
• Verify that the
Air Flow Valve
,
O2 Flow Valve
and the
Exhal
ation
Flow Valve
are
energized (
!
).
• Set the
Air DAC
,
O2 DAC
, and the
Exh
alation
DAC
counts to 60,000.
3. Connect a negative pressure squeeze bulb to the
INSP
iratory outlet.
4. Plug the
EXP
iratory inlet and the Auxiliary pressure port (
Paux
).
5. Fully depress the squeeze bulb.
• The bulb should not fully inflate in less than 5 seconds.
• if not, troubleshoot the inspiratory effort valve.
6. Disconnect the squeeze bulb from the
INSP
iratory outlet.
7. De-energize (open) the inspiratory effort valve
(
"
Effort Valve Energized
).
8. Set the
Air DAC
,
O2 DAC
, and
Exh
alation
DAC
counts to zero.
AB.98.087
Содержание Engstrom Carestation
Страница 1: ...Engström Carestation Technical Reference Manual ...
Страница 12: ...Engström Carestation x 08 07 1505 1018 000 ...
Страница 52: ...Engström Carestation 2 26 08 07 1505 1018 000 ...
Страница 100: ...Engström Carestation 5 26 08 07 1505 1018 000 ...
Страница 124: ...Engström Carestation 7 16 08 07 1505 1018 000 ...
Страница 188: ...Engström Carestation 8 26 08 07 1505 1018 000 ...
Страница 225: ...ERROR undefined OFFENDING COMMAND STACK ...