5 Service Tests and Calibration
1505-1018-000 08/07
5-5
5.2.3 Vent engine debris
clean-out
This procedure is needed only if:
• The pneumatic system within the vent engine was serviced; that is,
components were replaced or removed for evaluation.
• A gas inlet filter was replaced.
Clean-out procedure
1. Open both shut-off valves.
2. Verify that the inspiratory outlet is open to atmosphere (not plugged).
3. On the VCB screen:
• Verify that the
Air
and
O2 Flow Valve
s are energized (
!
).
• Set the
Air DAC
counts to 60,000 (fully open).
• Set the
O2 DAC
counts to 60,000 (fully open).
4. After 20 seconds:
• Close both shut-off valves. Pulse the Air and O2 flow valves 5 times for
5 seconds.
• Set the
Air DAC
counts to zero (closed).
• Set the
O2 DAC
counts to zero (closed).
Note
Closing the shut-off valves before setting the flow DAC counts to zero, bleeds
pressure from the system.
Содержание Engstrom Carestation
Страница 1: ...Engström Carestation Technical Reference Manual ...
Страница 12: ...Engström Carestation x 08 07 1505 1018 000 ...
Страница 52: ...Engström Carestation 2 26 08 07 1505 1018 000 ...
Страница 100: ...Engström Carestation 5 26 08 07 1505 1018 000 ...
Страница 124: ...Engström Carestation 7 16 08 07 1505 1018 000 ...
Страница 188: ...Engström Carestation 8 26 08 07 1505 1018 000 ...
Страница 225: ...ERROR undefined OFFENDING COMMAND STACK ...