
V1.0
20170825
51
5. Use
Stations and reagents related to the allocation step line
Click the station expansion button in the step editing
dialog box, and the dialog box of staining station and
reagent selection is displayed. Touch to select a proper
station as the current step allocation station.
“Reagent”: automatically added after station allocation
(the operator should allocate reagent to the station in
advance; otherwise, the program cannot be created).
For details, please refer to Section 5.6.2.
Fig.47
Except the water washing station, each station can only be selected once
in the same program, and selected stations are highlighted by gray
markers. (As is shown in Fig. 47)