SiBE18-821_C
Test Operation
Test Operation and Field Settings
131
Example of DIP switch (DS2) settings on the BP unit's PCB
DS1 ~ 4 : Factory setting is OFF.
The BP unit 1 through 3 show the first through third unit, respectively. The order of these BP
units is flexible.
The above table is only for your reference. The redundancy of addresses can be avoided when
the DIP switch settings are individually specified.
With the DIP switch settings reprogrammed, power on the outdoor unit and BP unit again.
Check for address redundancy.
Note:
If an error display appears on the indoor unit, BP unit or outdoor unit, follow its code and
description.
DS2-1
DS2-2
DS2-3
DS2-4
BP unit 1
OFF
OFF
ON
OFF
BP unit 2
OFF
OFF
OFF
ON
BP unit 3
OFF
OFF
ON
ON
Содержание Super Multi Plus E-Series FTXG25EV1BW
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...