![Daikin Super Multi Plus E-Series FTXG25EV1BW Скачать руководство пользователя страница 424](http://html1.mh-extra.com/html/daikin/super-multi-plus-e-series-ftxg25ev1bw/super-multi-plus-e-series-ftxg25ev1bw_service-manual_4705813424.webp)
Troubleshooting for Outdoor Unit
SiBE18-821_C
412
Troubleshooting
7.26 Check Operation is not Conducted
Remote
Controller
Display
U3
Method of
Malfunction
Detection
Check operation is executed or not
Malfunction
Decision
Conditions
When the unit starts operation without check operation
Supposed
Causes
Check operation is not executed.
Troubleshooting
Has the
check operation
performed from the
outdoor unit
PCB?
Caution
Be sure to turn off the power switch before connecting or disconnecting
connectors, or parts may be damaged.
Performs the check operation
again and completes the check
operation.
When a leakage detection
function is needed, normal
operation of charging refrigerant
must be completed. Start once
again and complete a check
operation.
Press and hold BS4 on the service
PCB (A2P) for 5 seconds or more,
or turn ON the local setting mode
2-3 to conduct a check operation.
(R13045)
NO
YES
Содержание Super Multi Plus E-Series FTXG25EV1BW
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...