Outdoor Unit
SiBE18-821_C
436
Removal Procedure
1.2
Removal of PCBs / Electrical Components
Procedure
Warning
Be sure to commence the disassembling work after 10 minutes or
more elapsed from all power supplies have been turned off.
Step
Procedure
Points
1
Remove the 2 screws
of the terminal
mounting plate.
Preparation
Remove the outer panels
according to the “Removal of
Outer Panels”.
M5(3) × 12
2
Remove the screw
above the electrical
component assembly.
M5(3) × 12
3
Unfasten the clamp
from the terminal
mounting plate.
(R12966)
Terminal mounting plate
(R9220)
(R9221)
Содержание Super Multi Plus E-Series FTXG25EV1BW
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...