SiBE18-821_C
SA Indoor Unit - FFQ, FCQ, FDBQ, FBQ, FHQ Series
Operation Manual
271
14
English
Operation Method
1
f
1/2
i
2/2
Operation procedure
Remote Controller Functions
Operation Method
1
Operation screen
display
Describes screens that
will be displayed on the
remote controller in
operation.
Operation button
display
Displays the positions of
buttons to be operated.
•
Press buttons to select
on the main menu
screen.
Press Menu/Enter button to display
the timer settings screen.
Basic Operation Method
(Use of Direct Buttons)
Cool/Heat/Auto/Fan Operation
(SkyAir and VRV)
Explains a button operation
procedure for the remote controller.
Operate the buttons according to
the procedure.
•
Displays the main menu screen.
(See page 26.)
* Items presently enabled or disabled are
displayed.
Preparation
•
For mechanical protection purposes, turn ON the system at least six hours before starting the
operation of the system.
•
Do not turn OFF the system in season in order to ensure the smooth starting of the system.
•
Press Operation Mode Selector button
several times until the desired mode
Cooling, Heating, Fan, or Auto mode is
selected.
* Unavailable operation modes are not displayed.
* Only the Cooling or Fan mode can be selected if the air
conditioner is a cooling-only model.
* The Auto mode can be set in the case of the VRV
cooling/heating simultaneous operation system.
* Changeover under control will appear on each remote
controller, but only the Cooling or Fan mode can be set
in the case of the VRV cooling-only system.
Note
•
Before making a mode change, make sure that Changeover
under control is not displayed on the remote controller.
The cooling or heating mode cannot be selected if the above is
displayed on the remote controller. See page 21 if Changeover
under control display blinks.
Содержание Super Multi Plus E-Series FTXG25EV1BW
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...