24
CTC EcoZenith i360
X2
In such cases, work flow points 1–6 can be used for electrical installation.
EcoZenith i360
1 heating circuit
1 CTC EcoAir heat pump in the 400,
500 or 600 series
CTC EcoZenith i360
1 heating system
1 heat pump in the CTC EcoPart
400 or 600 series
6.1
Overview of basic electrical installation
Basic installation includes:
1
2
3
4
5
6
Install fuse panel
Current sensor
fitted*
Fit outdoor
sensor
Fit room
sensor*
Connect heat
pump
Finish electrical
installation
Omnipolar
switch
Fit on fuse
panel
Place
representatively
for outdoor
temperature
Place
representatively
for house
temperature
Connect
communication
cable, terminal
block X2
Provide
information
on house fuse
size to pipe
installation
engineer
Connect factory-
fitted feed cable
Connect to
terminal block
X2
Connect to
terminal block
X2
Connect to
terminal block
X2
Connect external
power supply to
heat pump
Check and
sign electrical
installation
checklist
* option – can be selected
Содержание EcoZenith i350 L 1x230V
Страница 3: ...162 505 77 1 2020 09 15 Installation and Maintenance Manual CTC EcoZenith i360 ...
Страница 127: ...127 CTC EcoZenith i360 ...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 505 77 1 2020 09 15 ...