90
CTC EcoZenith i350
11.17 Ext Boiler
Ext. Boiler mode
Auto (Auto/On/Off)
Mode for adjusting an external boiler.
Auto = adjusted as needed according to selected
settings.
On = always active
Off = mode in which the external boiler does not start,
e.g. because there is no hot water available.
Boiler start outtemp (°C)
0 (-30/30)
The maximum outdoor temperature required for the
external boiler to activate in Auto mode.
Delay stop ext boiler (min)
0 (0 to 1440)
If an external boiler is no longer needed, shutting it off
can be delayed. This is used to avoid operating times
too short (risk of corrosion). The boiler is kept hot
according to the set time. 10 minutes at a time
Boiler, open mix.valve °C
70 (20 to 90)
This is the minimum temperature required in the external
boiler tank (B9) for the mixing valve to open and emit
heat to the system.
Ext boiler diff °C
5 (1 to 15)
Temperature difference compared to desired tank
temperature before the mixing valve is allowed to open
Start boiler, degree minute
-300 (-900 to -30)
For the shunt to open and emit heat to the system, this
requires a loss of degree minutes, which is set here.
Priority DHW tank
Low (Low/High)
Controls whether or not the external boiler is prioritised
before electricity is added when producing hot water.
Low – immersion heater activated before external boiler
High – external boiler activated before adding electricity
Smart block boiler
Off (Off/On)
Controls whether the external boiler is blocked by
settings in Smart Grid function
Tariff add heat
Off (Off/On)
Controls whether the external boiler is blocked by tariff
settings.
Set. External boiler
Ext. Boiler-Mode
Auto
Boiler start outtemp
0
Delay stop ext boiler
0
Boiler, open mix.valve ºC
70
Stop diff °C
5
Start boiler, degree minute
-300
PriorityDHWtank
Low
Smart block boiler
Off
Tariff ext boiler
Off
Ext boiler diff °C
3
Содержание EcoZenith i350 H
Страница 4: ...4 CTC EcoZenith i350...
Страница 27: ...27 CTC EcoZenith i350...
Страница 29: ...29 CTC EcoZenith i350...
Страница 30: ...30 CTC EcoZenith i350 X2 6 4 Wiring diagram CTC EcoZenith i350 3x400V...
Страница 32: ...32 CTC EcoZenith i350 X2 6 5 Wiring diagram CTC EcoZenith i350 1x230V...
Страница 34: ...34 CTC EcoZenith i350 X2 6 6 Wiring diagram CTC EcoZenith i350 3x230V...
Страница 105: ...105 CTC EcoZenith i350...
Страница 115: ......
Страница 116: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 205 22 2 2017 11 14...