![CTC Union EcoZenith i350 H Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ctc-union/ecozenith-i350-h/ecozenith-i350-h_installation-and-maintenance-manual_2693231020.webp)
20
CTC EcoZenith i350
!
NB: Safety valve
The tank’s safety valve (2.5 bar) for the heating circuit must be fitted in
accordance with applicable regulations. The waste pipe is connected to the
waste system, either directly to the floor drain or via a funnel. The waste pipe
must slope towards the waste system, be installed frost-free and left open to
the atmosphere/without pressure. The waste pipe must be fitted to the waste
system.
5.8
Install waste water piping
Waste water
5.8.1 Fit the safety valve, vent valve and manometer. Components and
assembly instructions are included in the additional pack for the
product.
5.8.2 Install waste water piping
5.8.3 The vent valve is activated by loosening the bleeder screw, which
should then be closed after a few minutes.
4.8.1
to vent and safety
valves
4.8.2
to waste water piping
safety valve
4.8.3
activate automatic
bleeder
manometer
Содержание EcoZenith i350 H
Страница 4: ...4 CTC EcoZenith i350...
Страница 27: ...27 CTC EcoZenith i350...
Страница 29: ...29 CTC EcoZenith i350...
Страница 30: ...30 CTC EcoZenith i350 X2 6 4 Wiring diagram CTC EcoZenith i350 3x400V...
Страница 32: ...32 CTC EcoZenith i350 X2 6 5 Wiring diagram CTC EcoZenith i350 1x230V...
Страница 34: ...34 CTC EcoZenith i350 X2 6 6 Wiring diagram CTC EcoZenith i350 3x230V...
Страница 105: ...105 CTC EcoZenith i350...
Страница 115: ......
Страница 116: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 205 22 2 2017 11 14...