12
CTC EcoZenith i350
CTC
MP
5. Pipe installation
The installation must be carried out in accordance with the applicable
standards.
Do not forget to flush the heating circuit clean before
connecting.
Apply all the installation settings based on the description in the
section entitled “First start”.
In order to adjust the pre-pressure in the expansion tank and check the
pipe connectors before first start, the front must be dismantled by loosening
two screws on the top of the front plate and lifting the front plate up and
out of the product. Bear in mind that the cable to the display on the front is
sensitive to damage.
5.1
Schematic diagram, basic
installation of
CTC EcoZenith i350 for air-to-
water heat pump
CTC EcoZenith i350
1 heating circuit
1 compatible heat pump
EcoAir from 400 or 500 series
B15
B11
Содержание EcoZenith i350 H
Страница 4: ...4 CTC EcoZenith i350...
Страница 27: ...27 CTC EcoZenith i350...
Страница 29: ...29 CTC EcoZenith i350...
Страница 30: ...30 CTC EcoZenith i350 X2 6 4 Wiring diagram CTC EcoZenith i350 3x400V...
Страница 32: ...32 CTC EcoZenith i350 X2 6 5 Wiring diagram CTC EcoZenith i350 1x230V...
Страница 34: ...34 CTC EcoZenith i350 X2 6 6 Wiring diagram CTC EcoZenith i350 3x230V...
Страница 105: ...105 CTC EcoZenith i350...
Страница 115: ......
Страница 116: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 205 22 2 2017 11 14...