
AC Repair and Adjustment Procedures
FRP 4: Auxiliary Clock Power Supply Replacement
HMM-168-A
Cray Research/Silicon Graphics Proprietary
31
Figure 9. Power Supply Detail
5.
Disconnect the control cable from the power supply.
6.
Remove the power supply from the cabinet using a short Phillips
screwdriver. Four M4 screws (with washers) secure the power supply to
the top of the WACS box.
Power Supply Installation
1.
Position the replacement power supply in the cabinet.
2.
Secure the power supply to the top of the WACS box with the 4 Phillips
screws and washers.
3.
Connect the control cable to the power supply.
4.
Connect the power cord to the power supply.
5.
Return the system to operation, and close the front cabinet door.
Screw
Locations
Control
Connection
Fuses
Power
Connection