FRP 14: Module-to-WACS Cable Replacement
AC Repair and Adjustment Procedures
106
Cray Research/Silicon Graphics Proprietary
HMM-168-A
Figure 50. Wire Insertion
4.
When you complete the wiring, insert a plastic connector pin lock (P/N
01775900) in the rail connector and ensure that the pins are straight. Use a
dental pick to insert the pin lock, as shown in
5.
From the wiremat side, gently pull the connector block close to its final
position in the rail.
6.
Ensure the proper orientation of the connector, then position the
connector in the connector slot, and insert the hex screws. Tighten all
three hex screws to 15 in-oz.
7.
Install the spring and center it in relation to the connector block.
8.
Push the connector toward the spring to ensure that the connector moves
laterally and then springs back into position.
9.
Insert the foam plug in each connector slot. Ensure that the wires pass
through the slit in the middle of the foam.
10. Use a 5-mm hex wrench to connect the other end of the cable to the panel
behind the I/O bulkhead (clock-to-WACS cable) or to the control
bulkhead (PEM-to-WACS cable).
11. Use tie wraps to secure the wire in the wiremat.
12. Use a small flatblade screwdriver to connect the WACS harness connector
to the cable that you just installed.
13. Replace and cam the modules that you removed. Refer to
FRP 5
.
14. Reinstall any panels and parts that you removed earlier.
Move the clock wire
connector to the
appropriate location.
Gently push the
clock wire connector
into rail connector.
Press the top of the
connector to fully
seat it in the rail
connector.
Rail Connector
Step 3